↔
How to Integrate Jira with Notion
Native vs Make vs n8n vs Relay, setup time, cost & field mapping
Integration Status
Jira (Project Management) has a native integration with Notion (Productivity). Sync Jira issues and tasks to Notion for unified project management and automated task assignments. Typical setup takes around 15 minutes.
Data Flow Architecture
Jira
Notion Integration Overview
Streamline your workflow with Jira-Notion integration. Automate task assignments and eliminate manual data entry.
Primary Use Case
Sync Jira issues and tasks to Notion for unified project management and automated task assignments.
medium
15 minutes
Automate Jira + Notion with n8n
Free, open-source workflows you can import into n8n in one click, no subscription required.
- → Classify new bugs in Linear with OpenAI's GPT-4 and move them to the right team
- → Automate Customer Support Issue Resolution using AI Text Classifier
- → Add positive feedback messages to a table in Notion
- → Analyse papers from Hugging Face with AI and store them in Notion
- → Automate Competitor Research with Exa.ai, Notion and AI Agents
- → Automate LinkedIn Outreach with Notion and OpenAI
Update Notion by sending a message
Notis is a messaging-first AI assistant built around Notion. Send it a voice note from WhatsApp or Telegram and it creates the entry in the right database, fills the fields, and follows your existing structure. Ask it "what did I decide about the pricing page?" and it queries your databases directly rather than guessing from a text search.
Voice transcribed at 99% accuracy across 56 languages, then routed to the right database with the right properties.
Code INTEGRATESTACK for 10% off. Affiliate link, at no extra cost to you.
Ready to automate? We have a template for you.
Copy this Jira → Notion blueprint, open Make.com, paste it into the canvas, and your workflow is ready to configure.
{
"name": "Jira → Notion Sync",
"flow": [
{
"id": 1,
"module": "jira:WatchIssues",
"version": 1,
"parameters": {},
"mapper": {},
"metadata": {
"designer": {
"x": 0,
"y": 0
},
"restore": {},
"expect": [
{
"name": "body",
"type": "text",
"label": "Body"
}
]
}
},
{
"id": 2,
"module": "notion:CreatePage",
"version": 1,
"parameters": {},
"mapper": {},
"metadata": {
"designer": {
"x": 300,
"y": 0
}
}
}
],
"metadata": {
"instant": false,
"version": 1,
"scenario": {
"roundtrips": 1,
"maxErrors": 3,
"autoCommit": true,
"sequential": false
}
}
} Blueprint copied to clipboard. open Make.com and paste it into the canvas to activate your workflow.
Frequently Asked Questions
How do I connect Jira to Notion? ▼
There's no native integration. To connect them, you will need a middleware tool like Make or n8n.
Is the connection between Jira and Notion secure? ▼
Yes. This integration typically uses OAuth 2.0, meaning you grant permission via a secure login window. You do not need to share your raw password, and you can revoke access at any time from your Jira security settings.
Is the sync one-way or two-way? ▼
This is typically a one-way sync: Jira → Notion. Changes in Notion do not sync back to Jira.
Will existing data in Jira sync to Notion? ▼
Usually, no. Most native integrations are "forward-looking," meaning they only sync data created or updated *after* you activate the connection. To move historical data, you will likely need to perform a one-time CSV export/import manually.
Can I sync custom fields? ▼
Native integration is limited to standard fields. For custom field mapping, use an automation tool.
Using Jira and Notion with other tools?
Build your full stack map, see all connections and gaps at once.